One more year??

DCIM103GOPRO

The realization has started to set in that we may need another year on the hard to complete Akupara’s refit. There is a battle raging in my head as to whether we launch without being 100% finished, or if we wait until we are 100% finished. The issue is several fold. On the one side, if we gave the old Lehman a tune up and completed enough jobs to at least look complete, we could spend the summer on Akupara while she is afloat, working on the jobs that still need completion. On the other hand, it would basically amount to 3 lost months of work as when we are at the dock, there at times can be a bit more socializing than working going on. On the other hand, if we wait to launch, we can complete more of the jobs we have scheduled, like replacing the Lehman etc.

Of course life has a way of getting in the way as usual. Braces, college tuition, school trips. All these things add up to subtract from the refit budget. Another year would help ease that financial pain.

I am about half way complete sanding the decks. I still have the aft cabin area, and the cockpit to do. Not to mention all of the stanchions still need to come up. But, the majority of the decks have had a good rough sand with 80 grit. The shrinkwrap cover is a blessing and a curse at the same time. It allows us to be dry and get a lot completed but it makes it very difficult to work on deck as you can only stand up in the centre line and have to crouch somewhat on the sidedecks.

DCIM103GOPRO

We will continue slogging it out for a while yet, but there may be a change of course coming up. It would be nice to feel Akupara move a little bit in the water.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.